Manufacturing Facility Construction: Building Around the Production Process
— 9 min read
In manufacturing facility construction, the building is only one part of the system. Production equipment influences every aspect of the project’s design and construction: material selection, foundations, utility routing, drainage, power distribution, fire protection, and even how equipment will be installed, serviced, or replaced years later.
And as manufacturing becomes more sophisticated, the smallest details can carry the greatest operational consequences. Floor flatness, vibration, equipment access and clearances, everything down to the timing of a utility connection; these all determine whether the facility can perform as intended.
Due to these layers of interconnectedness, the most effective advanced manufacturing facilities are planned as integrated systems, with building design, infrastructure, construction approach, and production processes developed in parallel.
Start With the Manufacturing Process
An intuitive way to understand the inner workings of a manufacturing facility is to follow the product through it. What comes in and where? How is the material / product produced? What equipment moves it? What utilities support that equipment? Where does waste go?
At the Richmond production brewery originally built for Stone Brewing, and now operated by Sapporo, those questions shaped the approach to building the facility itself. The brewing operation brings together fermentation tanks, process piping, boilers, chillers, bottling and canning lines, and drainage and electrical systems, to create a tightly integrated production environment. It’s symbiotic. Each of these systems depends on the others to keep the brewing process moving efficiently.

Some requirements are impossible to overlook, but without the right solution, they can dictate, or limit, how the entire facility operates. Fermentation tanks are central to a brewery’s production capacity; at Stone Brewing, each tank holds approximately 40,000 gallons, and the tank farm was designed to accommodate 40 tanks at full buildout. When full, each tank weighs approximately 400,000 pounds. To support that load while giving the brewery room to expand, Hourigan developed an elevated tank farm reinforced with more than 100 tons of reinforcing steel and concrete up to five feet thick. The structure was isolated from the surrounding building to help control settlement and vibration.
Other requirements are largely invisible once the facility is operating. Brewing produces substantial volumes of hot organic and chemical waste that cannot simply flow into a standard sanitary system. At Stone Brewing, approximately 2,200 linear feet of chemical-resistant underground piping and trench drains were designed to carry fluids reaching up to 240°F from the production areas to a retention system, where the waste is pH-balanced and filtered before entering the municipal sewer. Because much of that infrastructure sits beneath the production floor, its routing, elevations, drain locations, and connections had to be coordinated early, well before slabs were poured and brewing equipment was installed. Furthermore, fireproofing was also important as the room where the barley enters the facility needed to be designed to contain potential dust explosions, which can occur with fine grain particles.
At Stone Brewing, the production process shaped both the visible facility and the infrastructure beneath it, an example of the building following the operation, not the other way around.
Coordinate Production Equipment and Building Systems Early
Once equipment requirements are defined, the next risk lies at the interfaces: where structure, utilities, owner-furnished and contractor-installed equipment (OFCI), and construction sequencing converge.
The importance of seamless coordination was particularly visible at Feed More’s new Richmond headquarters, where a commercial production kitchen, freezers, coolers, warehouse systems, and support spaces all carried different infrastructure requirements. Feed More also reused existing equipment and contracted some storage, racking, and low-voltage systems separately, which meant those owner-managed scopes had to be integrated into the building design and construction sequence.

In the kitchen, extensive below-slab plumbing required penetrations and block-outs to be fixed before concrete was placed. Freezer and cooler areas introduced multiple slab elevations and specialized assemblies, including glycol lines, insulation, and recessed slabs. Equipment locations, slab conditions, and installation sequencing therefore had to be resolved early; once the concrete was in place, changes would have meant costly rework and schedule impacts.
In the kitchen, extensive below-slab plumbing required penetrations and block-outs to be fixed before concrete was placed. Freezer and cooler areas introduced multiple slab elevations and specialized assemblies, including glycol lines, insulation, and recessed slabs. Equipment locations, slab conditions, and installation sequencing therefore had to be resolved early; once the concrete was in place, changes would have meant costly rework and schedule impacts.
Because Feed More’s busiest season centers on Thanksgiving, the warehouse needed to be operational before the rest of the facility was fully complete. Hourigan sequenced equipment installation, inspections, and turnover so Feed More could begin stocking inventory and training staff and volunteers in the warehouse while work continued elsewhere in the building. That phased approach protected the organization’s seasonal operations without waiting for full project completion.
At Feed More, coordination was ultimately about operational readiness: making sure the right spaces, systems, and equipment came online when the organization needed them most.
Plan for Precision in Manufacturing Facility Construction
In some manufacturing environments, construction tolerances become production requirements because the equipment depends on the building for alignment and stability. At Unilock’s manufacturing and distribution facility in Doswell, where they produce premium interlocking concrete pavers and architectural hardscape materials, the product moves through mixing, pressing, curing and finishing equipment along precisely aligned tracks. For one of the primary presses, the allowable variance in the supporting steel and concrete is no more than 1 millimeter. At that level of precision, the slab becomes part of the production system.

At Unilock, Hourigan translated evolving equipment requirements from German supplier Hess Group into the building design while both equipment procurement and construction were advancing. Because the equipment was being developed overseas, dimensions, loads, tolerances, and connection requirements were arriving on a separate timeline and had to be reconciled with U.S. design standards and field conditions. Hourigan coordinated slab elevations, utility trenches, anchorage, and structural loads early enough to shape the work around the equipment, keeping construction moving while reducing the risk of late changes and rework.
Precision is not always measured in millimeters. At American Paper’s paper-converting facility, the production equipment created a different set of demands. Machinery vibration required isolated slabs, forklift travel areas required heavier concrete, and the facility’s compressed-air system influenced the size and capacity of the compressor room. In each case, the building had to respond to how the equipment would operate.
Together, the Unilock and American Paper examples show how equipment specifications can become building criteria. Whether the issue is alignment, vibration, loading, or utilities, those requirements need to be understood early enough to shape the structure and systems around them.

Expand Without Interrupting Operations
At an active manufacturing facility, expansion requires meticulous sequencing and attention to detail, as new capacity has to be created without taking existing operations offline.
At KSB’s Henrico facility, the company’s main distribution center for storing and repairing pumps and components, expansion includes production, storage, and office capacity, but doing so with the firm requirement that operations cannot stop.
With a carefully planned, three-phase handoff, Hourigan is rebuilding one side of the warehouse, turning that completed space over so operations can shift, and then repeating the process on the opposite side. Employees temporarily relocate to trailers, while a weatherproof separation wall and controls for noise, vibration, dust, and traffic allow construction and daily operations to coexist. One of the more complex phases divides the active production area to construct a new central mezzanine. Our number one priority while working in an active facility is safety. We ensure that all facility employees, our employees, and trade partners go home safely each night.
The equipment adds another layer. A new 15-ton bridge crane requires specialized structural support, while the building is also being planned for potential future cranes. A large Kardex automated storage system presents a different challenge because it must be delivered in sections and assembled on site.
At KSB, the measure of success is not just added capacity; it is expanding the facility without interrupting the ongoing operation.

Build the Operation, Not Just the Building
Each project carries its own equipment demands: massive fermentation tanks requiring specialized structural support, presses dependent on millimeter-level tolerances, a commercial kitchen coordinated around reused equipment and phased turnover, and heavy industrial equipment installed around ongoing operations. The specifics change from project to project, but the lesson stays consistent: equipment requirements are design inputs, not downstream considerations.
Advanced manufacturing facilities perform best when the process, equipment, infrastructure, and building are treated as parts of one operating system. Understanding the intricacies of production early makes it possible to design a facility that supports the operation on opening day and can continue to support it as production evolves.